[:en]Installation of Solar Panels with LED lights on top of a 1.7 km stretch of Link Canal (both sides 3.4 kms)[:]
Cost (Cr.): 0.6
Status: Completed
Pecentage Of Physical Progress: 100%%
[:en]Installation of Solar Panels with LED lights on top of a 1.7 km stretch of Link Canal (both sides 3.4 kms)[:]