Area Based Development is considered to be an innovative and effective approach to facilitate sustainable growth by enabling local
area development and harnessing technology, especially technology that leads to Smart outcomes.
New Upcoming Projects
Cost 0.4 (Cr.)
Smart Home Tag Platform with Integration of Solid Waste Management
Cost 2.66 (Cr.)
Implementation of Public Wi-Fi Zone at different locations of New Town, Kolkata using HIDCO's Backbone Network System (Ph-I) including 05 (Five) years Operation and Management
Development of a Centre for Innovation, New Town Kolkata
Affordable Housing at Action Area IIC, New Town
Ongoing Projects
Cost 2.04 (Cr.)
Proposed Landscape Development and Construction of Micro Garden at New Town Kolkata
Cost 0.33 (Cr.)
Strengthening and renovation of the existing street by using shredded waste plastic with bituminous mix and preparation of two number Rams on the service road abutting to Mela Ground, AA-I, New Town, Kolkata
Cost 1.07 (Cr.)
Radar Speed Sign Devices for controlling of over speeding vehicles at New Town, Kolkata
Cost 2.7 (Cr.)
Construction of Covid Memorial at plot CC/4/1 in AA I of New Town, Kolkata
Cost 2.9 (Cr.)
Urban Recreation Park and Landscape Development New Town, Kolkata (Near City Centre - II)
Cost 0.53 (Cr.)
Installation of IOT enabled outdoor Public Message Boards in New Town, Kolkata
Cost 3.92 (Cr.)
Landscape Development of activity park opposite Neem Banani at AA-IIB, New Town, Kolkata
Cost 26.40 (Cr.)
Supervisory Control and Data acquisition system for advanced management plans of potable water resources at New Town
Cost 0.07 (Cr.)
Technology based English activity Classes for Students at Snehodiya
Cost 0.58 (Cr.)
Providing LT power connections to the Junction Box used for 82 Nos. CCTV surveillance system for different locations, New Town, Kolkata under WBHIDCO
Cost 0.11 (Cr.)
Bee Corridor at Eco Park, New Town, Kolkata
Cost 0.96 (Cr.)
Proposed Smart Building Solution for WB HIDCO Bhaban in New Town, Kolkata
Cost 0.49 (Cr.)
Arrangement of garden water by Solar Power Pumping Sets at different areas in AA-I & II under New Town, Kolkata
Cost 3.99 (Cr.)
Construction of Alaap:Banquet Hall and Citizen Interaction Area at Swapnabhor Senior Citizen Park, Block-BF, AA-IB, New Town, Kolkata
Cost 11.18 (Cr.)
Construction of Barrier Free Pedestrian friendly Footpath in AA-ID under NKDA, New Town, Kolkata
Cost 12.04 (Cr.)
Construction of Barrier Free Pedestrian friendly Footpath in AA-IC under NKDA, New Town, Kolkata
Cost 7.95 (Cr.)
Construction of Barrier Free Pedestrian friendly Footpath in AA-IB under NKDA, New Town, Kolkata
Cost 10.77 (Cr.)
Construction of Barrier Free Pedestrian friendly Footpath in AA-IA under NKDA, New Town, Kolkata
Cost 17.85 (Cr.)
Supply, Installation & Commissioning with Five years comprehensive Operation & maintenance of 1000 kW(2X500kW) on Grid SPV Power Plants on Canal Top at Bagjola Canal, New Town, Kolkata
Cost 4.16 (Cr.)
Utilization of effluent water from STP at AA-IIB & IIC for gardening under New Town, Kolkata Project
Cost 0.4 (Cr.)
Construction of Barrier Free Pedestrian friendly Footpath with street no. 175 (550 Mtr. Length) in AA-IC, New Town, Kolkata
Cost 2.86 (Cr.)
Supply, Erection, Commisisoning, Operation and Maintenance of Prefabricated Single Tank based Modular Biogas Plant in connection with Solid Waste Management at New Town, Kolkata under NKDA
Cost 0.15 (Cr.)
Supply and installation of one unit of smart outdoor air purifier including one year's maintenance,operation and collection of air quality data.
Cost 0.94 (Cr.)
Electrical and ELV work including Air Conditioner and Elevator for Smart Work Space at Plot no 67/1, AA-IIE, New Town Kolkata
Cost 11.51 (Cr.)
Technology Enabled Smart Street Signages for New Town.( Action Area-I)
Cost 5.50 (Cr.)
Landscape Redevelopment of Neem Bannani Park
Cost 0.14 (Cr.)
Smart Retrofication of Existing High Mast inside Eco Park, New Town, Kolkata
Cost 0.61 (Cr.)
Construction of Day Care Centre at block AD ( Action Area 1A), New Town
Cost 29.53 (Cr.)
Integrated Command and Control Centre ( ICCC)
Cost 4.93 (Cr.)
Installation of Smart Energy Efficient LoraWan based lighting application at different area of New Town, AA-IA,IB & IC
Cost 1.69 (Cr.)
Development of 8 Activity Zones within Green Corridor of AA-I
Cost 8.43 (Cr.)
Smart Sensory Park in Action Area II under NKDA
Cost 12.23 (Cr.)
Construction of the Community Centre at AA-II B, Plot No.1947/12 along Street No. 652
Cost 9.22 (Cr.)
Construction of Smart Workspace at Plot No. 67/1, AA-II E, New Town, Kolkata
Cost 0.55 (Cr.)
Design, Construction of Public Convenience Building (Near Axis Mall) at AA- IC, New Town, Kolkata
Cost 48.57 (Cr.)
Co Working Space : Community Living and Working
Cost 4.67 (Cr.)
Construction of water conservation measure within eco-Park with Qulaity and level Monitoring system
Cost 12.5 (Cr.)
Construction of the Community Centre at Action Area-1C, Plot no. CC/2&3, Premises no. 31-1111 under Smart City Mission.
Completed Projects
Cost 0.08 (Cr.)
Construction and Installation of Directional LED backlit Signages in Mangaldeep Subway in New Town, Kolkata
Cost 0.13 (Cr.)
Supply, Installation and maintenance of Facial attendance system for NKDA & HIDCO
Cost 6.4 (Cr.)
Setting up Integrated Interactive Tele presence system between VC Rooms of Smart City, NKDA & HIDCO. External Voip Connectivity Zoom, Skype
Cost 0.17 (Cr.)
Hosting of Blockchain Based Application at Vivek Tirtha
Cost 0.01 (Cr.)
Installation of IOT Based Biopod (Aqua - II) at the premises of NKGSCCL
Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and use of Digital Technology within ABD [ Part XI:- Providing illumination work at 2222 MAR Side of Entry Plaza near kolkata gate at AA-IC, New Town, Kolkata under NKDA]
Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and use of Digital Technology within ABD [ Part X:- Providing illumination work at 2222 MAR side of Entry Plaza near kolkata gate at AA_IC, New Town, Kolkata under NKDA]
Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and use of Digital Technology within ABD [ Part VII:- Drawing ALPANA applying Thermoplastic Paint with Reflectorising Glazz Beads on Bituminous Surface at Kolkata Gate in AA-I, New Town Kolkata]
Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and use of Digital Technology within ABD [ Part V:- Aboriculture Work at Entry Plaza for kolkata Narkelbagan under NKDA, New Town, Kolkata]
Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and use of Digital Technology within ABD [ Part IV:- Kolkata gate landscape work for entry plaza, only for seat planter at Narkelbagan under NKDA, New Town, Kolkata]
Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and use of Digital Technology within ABD [ Part III:- Aboriculture Work at Smart Plaza for kolkata Narkelbagan under NKDA, New Town, Kolkata]
Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and use of Digital Technology within ABD [ Part II:- Landscaping work of kolkata gate (Entry Plaza) in AA-I under New Town Kolkata]
Cost 0.93 (Cr.)
Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and use of Digital Technology within ABD [ PartI:- Landscaping work of kolkata gate (Smart Plaza) in AA-I under New Town Kolkata]
Installation of Smart energy efficient digitally enabled lighting near New Town Plaza/Clock tower, within ABD (Part I: Replacement of Existing Street Lighting for Energy Saving through Smart Control along with betterment of illumination at different locations at New Town AA-IA, New Town, Kolkata
Cost 0.08 (Cr.)
Integration of CCTV Surveillance for Supervision and Monitoring of Subway Akansha More, New Town, Kolkata
Cost 0.81 (Cr.)
Roof-Top Solar, Vertical Green Wall and Rainwater Recharge Proposal at NKGSCCL Building
Cost 0.32 (Cr.)
Installation of Intelligent CCTV Solution at Rabindra Tirtha
Cost 0.61 (Cr.)
Construction of Solid Waste Management Museum near 1st Rotary of New Town, Kolkata
Cost 0.9 (Cr.)
Construction of containerized café at Green verge adjacent to Ecospace roundabout, AA II, New Town
Cost 0.22 (Cr.)
Rejuvination of Bamboo Fencing at Road Divider Near Tank No - 3, AA - I, New Town
Cost 0.2 (Cr.)
Supply, Installation, Annual Opeartion and Maintenance Support for "Toilet Feedback Monitoring System" for New Town Kolkata
Cost 0.1 (Cr.)
Construction of Cattle Barrier and CCTV surveillance in front of NCB (Narcotic Control Bureau) Office Building within Action Are - I, NKDA
Cost 0.36 (Cr.)
Installation of Outdoor Gym Equipment at Eco Urban Village, AA-IIB, New Town, Kolkata
Cost 0.11 (Cr.)
Supply and installation of 4 nos Mosquito Traps in New Town Kolkata
Cost 0.14 (Cr.)
Smart Parking Solution in Tata Cancer Hospital
Cost 0.48 (Cr.)
Installation of Smart energy efficient digitally enabled lighting near New Town Plaza/Clock tower, within ABD (Part II: Providing Smart Street Light solution on LORAWAN Network at New Town, Kolkata under WBHIDCO
Cost 0.6 (Cr.)
Installation of Solar Panels with LED lights on top of a 1.7 km stretch of Link Canal (both sides 3.4 kms)
Cost 2.88 (Cr.)
Smart Library at Nazrul Tirtha, New Town, Kolkata
Cost 2.12 (Cr.)
Greening of Metro Pillars by IoT enabled vertical Garden